Projects

We deliver!  Call (707) 887-2207

HWY 101 Rapid Set Concrete

Hwy 101 from Canyon Rd to Cloverdale was under construction for asphalt repair and overlay, and it also required the installation of culverts for storm drains. We poured rapid set concrete as they needed a high-performance, fast-setting concrete repair material.

Napa Rock Crushing

Canyon Rock offers many services and here is our custom crushing division working in Napa county. We are custom crushing cobblestones into base rock for several vineyards in Napa.

Fulton Rd Reconstruction

Our concrete division, River Ready Mix, poured 4500 yards of concrete for the City of Santa Rosa, Fulton Rd project. Instead of paving with asphalt, the city wanted the strength and longevity of a concrete mix. We delivered prompt, efficient service providing a high-quality concrete mix. We are pleased to receive the 2020 Best Projects Award of Merit from the engineering News-Record-ENR California region. An ENR Best Projects award is considered one of commercial construction's most prestigious and coveted honors.

Smart Train Railroad Balast

Canyon Rock supplied a high specification railroad ballast from airport blvd south to the county line. This is a premium grade rock that goes through rigorous testing to ensure quality, strength, and gradation.

Tubbs Fire Rebuilds

River Ready Mix has poured concrete for hundreds of new homes for the areas that burned in the 2017 Tubbs Fire. From foundations, slabs, retaining walls, custom decorative work, and driveways.

Rip Rap Projects

Canyon Rock is known for it's high quality rip rap as customers use it all around Sonoma County and as far as Pacifica. Projects include landscape for homeowners, bank repair, road stabilization, and river and creek restoration.

City of Santa Rosa Pond Repair

Canyon Rock is supplying the City of Santa Rosa 4-9'' rock for a pond repair. They have several holding ponds that we have supplied aggregate to over the years.